TREATMENT PRINCIPLES AND AIMS                            

To design a wastewater treatment plant, the customer asked us to evaluate the ELECTROCOAGULATION SYSTEM for the removal of typical pollutant in such wastewater and to be able to drain the treated water into the sewer system.

Another option required was the ZERO LIQUID DISCHARGE and therefore the possibility of reusing the treated water with the least amount of consumption possible.

This option is possible using an ELECTROCOAGULATION PLANT since no chemicals are used and therefore the physical and chemical characteristics of the water to be treated have little variation compared to the treated water.



FIND THE INTECNA LOCATIONS

> GET IN TOUCH


TOP

©, Intecna Srl | Website created by Grazioli Design "Only for Dreamers"

To offer you the best possible service this site uses cookies. Cookie Policy & Privacy Policy